Right Right Slab

V1+ R boulder · 20 ft · ★★☆☆

Route 7 of 7 from left to right on Critical Path Boulder, with Right Slab on its left. Critical Path Boulder has 7 routes, from V0 PG13 to V6+ PG13; 3 are harder, and 1 other is the same grade.

Access

The 13-mile Scenic Drive requires a timed-entry reservation October to May and has seasonal gate hours. Calico Basin and Kraft Mountain sit outside the Scenic Drive and need no reservation.

Wet rock: Aztec sandstone loses much of its strength when wet. Do not climb for at least 24 to 48 hours after rain or snowmelt, or holds break off and routes are permanently damaged.

More routes on Critical Path Boulder

Open the climbing map · Search all routes