Desire Path

V0 PG13 boulder · 20 ft · ★★★☆

Route 3 of 7 from left to right on Critical Path Boulder, with Pop Top on its left and The Wizard’s Capps on its right. Critical Path Boulder has 7 routes, from V0 PG13 to V6+ PG13; 6 are harder.

First ascent: James Braithwaite (October 2025)

Access

The 13-mile Scenic Drive requires a timed-entry reservation October to May and has seasonal gate hours. Calico Basin and Kraft Mountain sit outside the Scenic Drive and need no reservation.

Wet rock: Aztec sandstone loses much of its strength when wet. Do not climb for at least 24 to 48 hours after rain or snowmelt, or holds break off and routes are permanently damaged.

More routes on Critical Path Boulder

Open the climbing map · Search all routes