Le Cheval Droit
V3 boulder · ★★☆☆
First ascent: unknown
Access
The 13-mile Scenic Drive requires a timed-entry reservation October to May and has seasonal gate hours. Calico Basin and Kraft Mountain sit outside the Scenic Drive and need no reservation.
Wet rock: Aztec sandstone loses much of its strength when wet. Do not climb for at least 24 to 48 hours after rain or snowmelt, or holds break off and routes are permanently damaged.
More routes on Le Cheval
- Le Cheval V2
- Le Cul de Cheval V5-6
- Bucephalus V4-5
- Ben’s Blessing V5+
- Fritz Problem V6-
- Le Cheval Sit V6
- Mr. Hands V5
- TsieBiscuit V4
Open the Red Rock climbing map · Is the rock dry? Live conditions