The Mass Production Wall climbing
7 routes · 2,999 ft elevation
Access
The 13-mile Scenic Drive requires a timed-entry reservation October to May and has seasonal gate hours. Calico Basin and Kraft Mountain sit outside the Scenic Drive and need no reservation.
Routes
- Parts is Parts 5.8
- Battery Powered 5.9
- Hit and Run 5.9
- Some Assembly Required 5.10+
- Trigger Happy 5.10a
- Kokopelli 5.10c
- Foreman Ferris 5.11c